OUR SERVICE WORK FLOWS
NOTICE FOR COMMENCEMENT OF EARTHWORK (NCE) FLOWCHART
Step 1: Earthworks Contractor obtains Flag Telecom Service Layout plan by email Flagplants.fibrewind@gmail.com.
Step 1: Free Site Survey
We always provide Free Site Survey before giving you quotation.
We also will dispatch our Professional Consultant to discuss with you about the site issue and recommendation to you.
Step 2: Quotation Provided
After discussion with you, we will provide a quotation based on your requirement and provide reasonable price for you.
​
​
Step 3: Professional Installation
Once the quotation is signed, we will arrange our Site Engineer to install the system or cable for you based on your requirement and our recommendation.
Step 4: Configuration And Commissioning
After the installation, our Site Engineer will provide a quick crash course on how to operate and our job process along with receiving the full payment.
Step 5: Aftersales Support
We will follow through and make sure your installation is taken care of.
Repairs, re-installation or upgrades,
We can get it done for you.
Step 2: After Contractor has confirmed that intended earthworks are within 15 meters of Flag Telecom plant asset
​
Engage Licensed Telecommunication Cable Detection Worker (TCDW) to carry out Cable Detection Work
Step 3: To submit the NCE Application And Schedule the Primary Site Meeting by hand and post the original to us.
Step 4: To conduct Joint Site Meeting, attended by TCDW / Flag Telecom Representative / Earthworks Contractor
Step 5: Contractor to submit updated cable detection drawing with proposed trial hole locations on the NCE application
Step 6: Flag Telecom to review documents and issue the Conditional Approval for Digging of Trial Holes
Step 7: Earthworks Contractors digs Trial Holes to ascertain exact location / route of Flag Telecom's Telecommunication Cables
Step 8: To conduct Joint Trial Hole Inspection, attended by TCDW / Flag Telecom Representative / Earthworks Contractor
Step 9: Earthworks Contractor to submit application for Final Approval For Commencement Of Earthworks to Flag Telecom, Including the following supporting documents
Step 10: Flag Telecom Representative to review documents and issue the Final Approval for Earthwork Commencement
Step 11: Earthwork Contractor may commence work
Download Plant Map Application Form
​
GCX005B - Request For Plant Map Application
​
GCX006B - Notification Of Commencement Of Earthworks (NCE)
​
GCX007B - Site Consultation Form
​
​
GCX009B - Conditional Approval For Digging Of Trial Holes
​
GCX010B - Application For Final Approval For Commencement Of Earthworks
​
GCX011B - Final Approval For Commencement Of Earthworks
​
GCX012B - Request For Extension Notification Of Earthworks
​
​
​